![](fifieldlayout012a.jpg) |
The Bear Creek Trestle was a railfan highlight in the Winona area, and this is
Deb's version of the famous structure.
|
![](fifieldlayout013a.jpg) |
The upper town is St. Charles and the lower is River junction.
|
![](fifieldlayout014a.jpg) |
Utica under constuction.
|
![](fifieldlayout015a.jpg) |
The engine is Milwaukee #216 and is an Overland model.
|
![](fifieldlayout016a.jpg) |
This shows Tortoise switch machines being installed in Rochester Yard. Most of
the work is done at the bench where it is easier.
|
![](fifieldlayout017a.jpg) |
Jeff laying track between St. Charles and Rochester.
|
![](fifieldlayout018a.jpg) |
This is a Campbell bridge kit. It is on the east end of St. Charles and the
track below goes to River Junction.
|
![](fifieldlayout019a.jpg) |
More of St. Charles and River Junction under construction.
|
![](fifieldlayout020a.jpg) |
Scenery construction on the Hiawatha Lines: Jeff is putting plaster cloth
over strips of cardboard. Sculptamold
goes on top of this.
|